Ploughing Services Australia

AusConnect operates D7 and D8 ploughs with static single and dual plough configurations, providing high-production installation of P50 over long distances in suitable open areas.

Our capability includes survey and site pegging, two pre-rip passes between 800mm and 1.3m depth, and zero-tension cable/conduit laying at installation depths typically between 900mm and 1.2m, subject to design requirements and ground conditions.
“AusConnect ploughing equipment installing underground cable and conduit infrastructure across Australia.”
“AusConnect ploughing equipment installing underground cable and conduit infrastructure across Australia.”
Get in touch today through our online enquiry form or give us a call.
Contact us
Our Ploughing Capability
AusConnect can manage the complete ploughing process, including:

-Survey and site pegging
-Two pre-rip passes
-Pre-rip depths between approximately 800mm and 1.3m
-Zero-tension cable and conduit laying
-Typical installation depths between 900mm and 1.2m
-Static single and dual plough configurations

Final installation methodology and depths are determined by project design requirements, ground conditions and site constraints.

For suitable projects, ploughing provides an efficient method of installing underground infrastructure across long, open alignments with minimal unnecessary ground disturbance.
Contact us
“AusConnect ploughing equipment installing underground cable and conduit infrastructure across Australia.”
15 Specialist Teams Across East Coast
Effective Non-Destructive Digging Solutions
State of the Art Equipment for Every Ground Type
Focus on Precision & Productivity
Let’s talk about your project
If you require Horizontal Directional Drilling in Victoria or South East
Queensland we have teams ready and waiting to get your project up and
running. Get in touch today through our online enquiry form or give us a call.
Contact us